Skip to main content

Guardian ANJEL

The Complete Emergency Management Solution

Real-Time Safety Technology Designed for the DoD

How Guardian ANJEL Works

Combining precision, reliability, and speed to meet the unique security needs of the DoD.

1

Set Up Your Base

Get started by configuring Guardian ANJEL for your organization using the BDOC Admin Panel. This will serve as the central hub for managing emergencies.

2

Onboard Your Team

Add team members, first responders, and app users to the system seamlessly. Ensure everyone is connected and ready to respond.

3

Manage Emergencies in Real-Time

Track, monitor, and manage emergencies effectively. Stay updated on user alerts and first responder activities with intuitive tools.

Effortless Emergency Management That Connects With Ease

Guardian ANJEL is making a difference where it matters most.

20%

Faster Emergency Response

Our technology improves response times by 20% in emergency scenarios, delivering swift and reliable support.

100%

Increase in Visual Data

Installation Security Forces, Fire and EMS now have first-person, visual data for enhanced incident assessment and response.

250%

Increase in Location Reporting

Precise and continuous geolocation data of incident is now available to first responders.

Complete Control

Combining precision, reliability, and speed to meet the unique security needs of the DoD.

Testimonials & Success Stories

What Leaders Are Saying About Guardian ANJEL

Guardian ANJEL technology holds the potential to not only address critical Defense needs but revolutionize how security and protection is approached. This application offers firsthand visual assessment, bridging gaps in current security protocols. Notably, it addresses the deficiency of comprehensive CCTV coverage at many DoD mass gathering areas. Guardian ANJEL introduces geo-spatial awareness, facilitating rapid response during incidents like active shooter scenarios. The application also has the potential to significantly cut overhead costs tied to constant surveillance. In high-stakes situations, Guardian ANJEL's live feed to controllers ensures a complete view, arming dispatch and patrols with invaluable support and a decisive advantage.

CHRISTOPHER J. PFEIFFER, SMSgt, USAF Operations Superintendent
316th Security Forces Squadron

Having a first-person, live video feed of a security incident is very helpful because the desk sergeant [dispatcher] is able to specifically see, especially in the case of an active shooter, what the individual is wearing and give an accurate description to the responding patrols. Sometimes the information we get from a caller isn’t very accurate. Having a video feed of what’s actually happening... and the geolocation of the incident is very beneficial, and it helps us get to the scene much quicker.

CHRISTOPHER B. RIVERS, TSgt, USAF Future Operations, NCOIC
316th Security Forces Squadron

As the Commander of Joint Base San Antonio and the 502d Air Base Wing, I am responsible for the safety and security of some 80,000 full-time personnel across 4 main operating locations and 11 additional geographically separated sites. The capacity to quickly communicate, establish shared understanding, and exercise command and control is fundamental to the successful operation of this installation, protection of personnel, and security of infrastructure vital to national security. Pluribus’ ANJEL technology has the potential to add significant capability and value to this task.

RUSSELL D. DRIGGERS Brigadier General, USAF
Commander

The Air Force Security Forces Center (AFSFC) develops, delivers, and executes Security Forces capabilities and associated programs for AF and Joint mission sets enabling a safe and secure operating environment. Pluribus’ ANJEL addresses these needs by introducing geo-spatial awareness and facilitating rapid response during base emergencies. Given the potential for enhancements to situational awareness and decision making, Pluribus’ ANJEL solution and future adaptations and integrations may greatly strengthen force protection and base defense needs starting with 316 SFS (Andrews AFB).

ALEXANDER ERB, GS-13, DAF Innovations Program Manager
Air Force Security Forces Center

I believe that bringing Pluribus’ ANJEL technology through the SBIR/STTR process is a step in the right direction.

JONATHON E. BYRNES, Col, USAF Director of ISR, Plans and Requirements
Air Force Installation and Mission Support Center

Pluribus technology fulfills two of the seven DAF Operational Imperatives: #5 Resilient Basing via ANJEL’s global availability; and #7 Readiness to Deploy and Fight via ANJEL’s live-streaming facility security and personnel threat deterrence systems. Pluribus provides an innovative and cutting-edge Commercial Solutions Opening technology that the DAF needs right now, in order to out-pace our adversaries and win in America’s Great Power Competition!

DR. PITMAN A. KENNEDY, CIV, USAF Innovation Program Analyst
Air Force Installation and Mission Support Center

With over 12 years in the esteemed Air Force Security Forces career field, I've been immersed in vital asset protection and law enforcement. Currently, I oversee law enforcement for a team of200 personnel, responsible for securing the installation and protecting vital Air Force assets key in securing national security interests. We are interested in Pluribus' ANJEL solution and how it could be adapted to support our mission needs. The potential impact on defense and security is undeniable, and I am excited to be part of the team that champions this capability.

ALEJANDRO FIGUEROA, MSgt, USAF Superintendent, Innovation & Technology
72d Security Forces Squadron

PLURIBUS’s Guardian ANJEL technology ... radically updates and modernizes a critical emergency reporting system: 911®. Created in 1957, the 911® system is almost 70 years old, and it still operates in the very same way: the “telephone game.” Cloud-based, live streaming technology is now available and widely used to report public emergencies, but only to social media thus far. Guardian ANJEL turns this modern-day phenomenon toward military police (first!), increasing their ability to respond to emergency incidents with much greater precision, effectiveness and officer safety.

James R. Balkcom, Jr. Civilian Aide to the Secretary of the Army, Georgia
Emeritus

The work being conducted by Pluribus, Inc. is of keen interest to Old Barn Holdings, LLC. because Guardian ANJEL directly aligns with Old Barn Holdings, LLC.’s needs in the area of cloud-based security systems. Our team recognizes the benefits of Pluribus Inc.’s proposed technology to revolutionize security incident reporting using their innovative, patented approach. Old Barn Holdings believes that the economically viable solutions to the modernization of security incident reporting is both a prerequisite to stated Air Force goals and the technology developed will have wide ranging applications across the rest of DoD.

Zachary Merriman Managing Member Old Barn Holdings, LLC

TOAMS Financial is an Investment and Wealth Management firm, with a diverse array of investment portfolios, including cutting-edge technologies like those developed by PLURIBUS. We have deep contacts and relationships with Law Enforcement agencies throughout the state of Florida, and we firmly believe the results of this DoD SBIR and development will be greatly appreciated and adopted by several municipal police stations in Florida.

Mario J. Payne President TOAMS Financial

What we love most about this technology is that it is so portable, utilizing cell phone technology as a lifeline to one’s community and loved ones. It is also cloud-based, which means it works worldwide, wherever you have cellular, Wi-Fi and/or internet connection. Next, we love the fact that the video evidence it live-streams is indisputable, so we have an accurate account of any security incident it views. I knew the very first moment we witnessed this technology that it would revolutionize how security incidents were reported, recorded and responded.

Tori Cooper, TJI Director Human Rights Campaign Foundation

As a commercial application, ANJEL Tech has no equal. I am excited and hopeful the Air Force will see not only how feasibly this technology can be adapted to its usage, but also how critical it is to its future success. I’ve always known the Air Force to be on the cutting edge of technology and for taking exceptionally great care of its members and families. Well, this is both.

Tansy McNulty 1M4 Founder & CEO